Gas Testing Capabilities
Gas Testing Capabilities
• Automated Pressure Control: 10,000 psi
• Manual Pressure Control: 22,500 psi
• Leak Test Mode
• Depressurisation: (Venting)
• Cyclic Pressure Loops
• Profile Writing
• Pressure and Temperature Monitoring
• Supervisor Control and Data Acquisition
• Engineering System and Tolerance Set Up
• Alarm Conditions and Diagnostic Review
The parameters below may vary dependent on test component volume.
• Maximum Operating: 1,550 bar (22,500 psi)
• Pressurisation Control Rates: linear between 1 and 30 bar/min
• Pressurisation Ramp Tolerance: to be maintained within +/- 10% (of full scale)
• Depressurisation Control Rates: Linear between 1 and 50 bar/min
• Depressurisation Ramp Tolerance: To be maintained within +/- 10% (full scale)
• Dwell Period: 1 minute to 3 months
• Dwell Period Pressure Stability: 0 (zero) bar to +5 bar
Data Logging
• Input of Batch Set-Up Information
• Data Measurements
• Trend Data
• Capture Data
• Store Data
• Print Reports
Pressure Testing Applications
Effectively simulating subsea conditions to ensure the integrity and reliability of seals, connectors, heat exchangers, subsea technology and components, for FAT or research and development.